Preparation of a Sub-base for a Football Turf System 4 Ground inspection Before designing a turf installation including a drainage network, each turf manufacturer needs to conduct a ground inspection to ensure that all factors that might have an influence on the construction work and the final
File Size: 627KBPreparation of a Sub-base for a Football Turf System. Download Preparation of a Sub-base for a Football Turf System PDF 0.61MB
Apr 29, 2013· Drainage requirements for a water-permeable base need additional subsurface drains to collect the water that seeps through to the sub-base. The base is usually leveled with a slope between 0.8 – 1%. The location and surroundings of the proposed site and the water outlet locations are important factors in the design of a drainage system.
FIFA Quality Concept For Football Turf – Method Statement 18. Compaction of sub-base materials 19. Fine-tuning of sub-base materials 20. Quality check on sub-base 21. In-situ shockpad 22. Pre-fabricated shockpad 23. Positioning of synthetic turf 24. Rolling out of synthetic turf 25. Seam preparation including cutting of seams/lines 26...
File Size: 800KBJun 21, 2019· Not to mention, it can cause artificial turf wrinkles. Before you install your sub-base, you first have to prepare the area. This contains a recap of area preparation. Just to make sure you’ve gone through everything. Ground preparation before installing the base material for artificial turf on soil/dirt surfaces: 1. Check for underground hazards
Author: Jason OcampoArtificial Turf Installation Ground Preparation: Sub-Base, Base, and Top Base Surfaces Materials Use the following step-by-step guideline based on conditions and materials available in the desert region of the Southwest. By following this process, it will insure that your installation meets the highest standard of quality and performance. 1.
Remove 3"-4" of existing sod and/or dirt. Be sure to set a rough grade for drainage. If irrigation system is present, cap and/or remove any sprinklers. Install & Compact Base Material. Lay 3"-4" of either Class II Road Base or Decomposed Granite. Using a plate compactor, compact base to 90%. Be sure base surface is as level and smooth as possible.
Walk me through a typical conversion of natural grass to get it ready for synthetic turf. 1) Excavate the existing natural grass and approximately 8” of soil. 2) Compact the subgrade soil to 95% or more. 3) Build a concrete curb with wooden nailer board to attach
Base System: A designed system of materials that provide porosity and stability such as soil, crushed aggregate, geotextiles, and drain lines. Drainage System: A method of removing surface and subsurface moisture / water. Infill: Loosely dispersed materials that are added to the synthetic turf system near the surface and within the turf fibers.
Not to mention, it can cause artificial turf wrinkles. Before you install your sub-base, you first have to prepare the area. This contains a recap of area preparation. Just to make sure you’ve gone through everything. Ground preparation before installing the base material for artificial turf on soil/dirt surfaces: 1. Check for underground hazards
The procedures below assume that all ground preparation, sub-base, borders, and synthetic turf materials have been completed and the surface is ready for infill. 1. Prepare all tools and equipment and ensure all safety precautions are met. 2.
Aug 14, 2007· Playbound Turftop Sub-Base Preparation. August 14, 2007. The excavation and preparation of the sub-base is to be done in advance of Surface America’s crews arriving for installation of the PlayBound TurfTop system. PlayBound TurfTop system can be installed on asphalt, concrete, crush stone, or excavated earth.
What makes up the base preparation? 1) Excavation of the existing soils 2) Compaction of the existing material... synthetic turf system or goes through the synthetic turf and infill into a porous crushed stone... So, a typical football field with 80,000 sq.ft. costs between $260,000 and $360,000 to build
A properly constructed base can provide up to 30 years of use under several synthetic turf installations. It is a large portion of your installation and it must be installed properly. Large Stones. Rocks ranging from three-eighths to three-fourths of an inch are perfect for artificial grass sub-base.
Sep 09, 2016· The field's sub-base was compacted to millimeter-level accuracy. "That took a lot of planning, preparation and studying with engineers on the best way to get it down," he says.
MAPEI’s Mapesoil 100 sub-base binder and Ultrabond Turf PU 1K adhesive were essential to repairing the flooded golf course at a top-notch recreation venue. MAPEI’s Mapesoil 100 sub-base binder and Ultrabond Turf PU 1K adhesive were essential to repairing the flooded golf course at a top-notch recreation venue. #sports
pipes. Turn system back on and run to test system for leaks if caps are not tightly secured. Removal of existing surface: The existing grass and approximately 3-5” based upon height of turf chosen of loose topsoil is to be removed and disposed into a lowboy dumpster, down to undisturbed earth.
† Irrigation system or other ways to apply water † Extra turf and crumb rubber † Vacuum/ShopVac † Adhesive construction glue † Gum remover † Backpack blower † Utility knife † Sand for sub-base low spots † Shovel † Snowblower † Tractor † 2-foot diameter tile drain tube for snow removal † Needle and thread † White rock...
This versatile system is suitable for a range of sporting and leisure applications and is fully FIH and ITF certified for hockey, tennis and multi-use applications. The proprietary fiber technology delivers a durable and long lasting system with market leading UV stability and player comfort properties.
Our high-strength synthetic fiber-mesh design holds the green grass in its place giving the Football players an adequate grip and control as they vector the field in any direction with any strength. Maintenance training will be done with staff on-site, to display how to best take care of the new synthetic turf field, as well as how to use the cleaning and grooming equipment.
Our...
Grade the sub-base. C. Base Preparation: Installing the base surface under the artificial lawn is critical to maintaining the stability and integrity of the artificial grass turf system. A layer of 3/8” crushed stone also called Class 2 Road Base, Decomposed Granite, or Chat should be spread evenly over the area. D.
Turf Football Field Cost. A turf football field costs about $850,000 and up to $1,000,000, with replacement costs of $500,000 every 8 to 10 years. Artificial football turf is constructed a little differently than residential artificial grass due to the rough use it gets, and it has extra padding to protect players during hard falls.
To ensure a top-quality, low maintenance and fast-draining surface, TigerTurf delivers a complete system including site preparation, installation of drainage, sub-base construction, application of TigerBond, comfort pad installation, surface installation, and post-project service and speed testing.